Testing & Validation

 

To ensure the functionality, safety and reliability of the steam turbo-generator, our R&D team uses high-tech testing facilities for validation of design.

The components and the steam turbine are tested for the validation of design using our in-house testing facilities like:

  • Wheel-box test facility for Performance and Stability validation of LP Blades.
  • Load test facility for Performance validation of HP, IP and LP blade modules.
  • Non-contact Blade-Tip Vibration Measurement (BVM) Test-Rig for Validation of Campbell Diagram of LP Blades.
  • Strain-Gauge and Telemetry based Blade-Tip Vibration Measurement Test-Rig for Validation of Campbell Diagram of LP Blades.
  • High Speed Balancing (HSB) Tunnel for Rotor Balancing and Lateral-Rotordynamic vibration response verification as per API 612/611.
  • Vacuum Tunnel for Overspeed Test.
  • Mechanical Run Test (MRT).
  • High Pressure Casing Integrity Test facility.
  • High Pressure Casing Joint Seal Test facility.
  • Natural Frequency Test (NFT) of LP Blades.
  • Advanced Material Testing – CREEP, Fatigue, Elevated Temperature Stress, Metallographic test….
  • Non Destructive Test (NDT).

Our R&D team works with the prime focus on customers. From the product development phase that begins with understanding of what the customer needs to delivering a robust, efficient and safe steam turbine.

Efficiency Enhancement
Stay Connected